Reconstructed teaching prompts and examples, not original transcripts. Historical conclusions remain in the supporting chapter linked below.
The request · show the prompt
Prepare the change, integrate it, and verify the user-visible result. Keep the objective open until each required piece of evidence is present.
What happened
A worker returned successfully, and its process status was treated as completion.
The clue
The requested outcome still lacked delivery or verification. A finished assignment was only one part of the job.
What changed
Write down the acceptance evidence before delegation. Review the worker’s return, integrate the change, and check the delivered result before closing the objective.
What the record establishes
The build record describes an objective contract that refuses completion when required proof is missing. The checklist below is a teaching example.
Try the lesson · show the prompt
List the evidence required for this objective to be finished. After each assignment returns, show which requirements it satisfies and what is still owed.